Skip to main content

Comparison

Tensel vs Railway

Choose Railway if you want databases, volumes, cron jobs and workers on the same platform as your app. Railway runs stateful workloads; Tensel deliberately does not.

Choose Tensel if the app itself is stateless HTTP and the deciding constraints are jurisdiction, a bill in euros a French accountant will accept, and a spend limit that cannot be exceeded.

What both do

  • Push to deploy from GitHub, with build logs streamed live.
  • Builds without a Dockerfile: Railway created Nixpacks, and Tensel builds non-Node languages with it.
  • Usage-based pricing on top of a subscription.
  • Automatic HTTPS, custom domains, rollback.
  • Applications can sleep when idle.

The differences

DimensionTenselRailway
Operating jurisdictionFrench company under EU law; hosted on Scaleway in ParisUS company, subject to US law including the CLOUD Act
Where your app runsOne region: Paris. Backups, logs and platform data includedRegions in the US, Europe (Amsterdam) and Asia
BillingEuros, EU VAT handled, Factur-X e-invoicesUSD, subscription plus usage
Team pricingTeam plan: €49/month, unlimited members, never per seatPro: $20 per seat per month, plus usage
Spend controlCustomer-set hard limit (2× plan by default); at 100% a 24-hour grace applies and its usage is absorbed, not billedUsage limits with configurable hard cap
Managed databasesNo managed databases; bring your own via environment variablesPostgres, MySQL, Redis, Mongo as first-class services
Workers, cron, volumesNo background workers, cron jobs or volumes; stateless HTTP onlyAll three: background services, cron schedules, persistent volumes
Preview environmentsNo preview environmentsPR environments, on by default on some plans
Static sitesDetected automatically, served from a European CDN, never billedServed from the app container; no separate unmetered static tier
Deploy without gitFrom a folder, in the browser or the CLIrailway up deploys a local directory
InvoicesFactur-X e-invoices (EU standard), usage by day and by projectStandard invoices in USD
AgentsEleven agent skills ship in the CLI package; skills hold no credentials; /llms.txt publishedMCP server available

Where Railway is ahead

  • Stateful workloads: managed Postgres, Redis, MySQL and Mongo, persistent volumes, cron jobs and background workers in one project.
  • PR environments.
  • Multi-region deploys, including outside Europe when you want them.
  • A template marketplace with hundreds of one-click stacks.

Where Tensel is ahead

  • Jurisdiction: a French company, Paris, EU law. Railway's European region is still operated by a US corporation.
  • Flat team pricing: €49 with unlimited members against $20 per seat.
  • Euros, EU VAT and Factur-X e-invoices.
  • A spend limit whose overrun grace is absorbed by the platform, not billed.
  • Static sites are detected and served free; the meters never touch them.
  • Agent skills that ship in the CLI package and never hold a credential.

The price for a team of five

Tensel Team
€49/monthunlimited members, €49 of usage included
Railway Pro, five members
$100/month$20 × 5 seats, plus usage

Public prices as checked on 24 August 2026, excluding tax. Dollar amounts depend on the exchange rate and do not include usage.

Frequently asked questions

Railway runs my Postgres. What do I do on Tensel?

Bring a managed database from a European provider and hand its URL to your environment as a secret. Tensel deliberately does not run databases; a stateless platform is simpler to keep reliable. The honest consequence is a second bill, from a second provider.

I use Nixpacks. Does my build carry over?

Very likely. Tensel builds Go, Python, Rust, PHP, Java and Ruby projects with Nixpacks from the same marker files. Node frameworks are detected directly, and a Dockerfile wins when present, the same rule Railway uses.

What about cron jobs and workers?

Tensel does not run them. If your app is a web process plus a worker plus a schedule, Tensel only hosts the web process today. The gap is listed on /product with the other missing pieces.

Comparison built on 24 August 2026 from Railway's public documentation. Spotted something out of date? Write to contact@tensel.eu and we will correct it. Trademarks belong to their owners; Railway is not a partner of or affiliated with Tensel.